Paragon Steel provided the aluminum and built eight gangways and ramps to provide dockside access to the Long Beach Aquarium of the Pacific.
Completed in June of 1998, the project took only eight weeks to complete. The length of the gangways and ramps were 90' long and had to be constructed with materials that could withstand exposure to salt water. |
|
 |